Customization: | Available |
---|---|
Material: | PPS Monofilament |
Layers: | Single |
Still deciding? Get samples of US$ 1/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features
Affordable pricing
Uniform fabric structure
High porosity and large surface area
Exceptional corrosion resistance, thermal stability, and flame retardancy
Applications
From what we've gathered, our clients are mainly using our PPS mesh for
SHARE PPS Filter Mesh Technical Datasheet | |||||||||
Material | Item No. | Specification | Thread Diameter | Mesh Opening | Open Area | Mesh Thickness | Weight | Tensile Breaking Strength | Tensile Elongation |
μm | μm | % | μm | g/m2 | (N/5CM) (warp/weft) | (%) (warp/weft) | |||
PPS | 20T-140 | 350/51PW | 140 | 350 | 51 | 260 | 86 | 660/643 | 29.5/27.8 |
PPS | 20T-150 | 340/48PW | 150 | 340 | 48 | 280 | 100 | 766/755 | 29.5/28.4 |
PPS | 47T-55 | 156/55PW | 55 | 156 | 55 | 100 | 34 | 246/253 | 26.4/30 |
Real Images
1. Rolled on the paper core or plastic pipe, packed into PE bags
2. Put into standard export carton
3. Put into PP woven bag to prevent damage during transportation
The label contains the following standard information:
item name, manufacturer, material, dimensions, manufacturing date, order number, batch number etc.
Port to Port | Door to Door | |
Express(DHL,UPS,FEDEX, EMS) | 1 - 5 days | |
Air Freight | 1 - 5 days | 4 - 10 days |
Sea Freight(FCL) | 15 - 30 days | 20 - 35 days |
Sea Freight(LCL) | 15 - 30 days | 22 - 37 days |
FAQ
1. Where is your factory located? How can I visit there?
We are in Taizhou city, Zhejiang province China. By train, we are one hour away from Hangzhou and two hours away from Shanghai.
2. Can I get free samples and how long can you deliver them?
We are pleased to provide you with free samples for your evaluation, which will be sent to you within 2 days. Please feel free to reach out to us for samples.
3. How long does a quotation take?
In most cases, we respond within 2 days. If something in RFQ need be confirmed, we will promptly notify you soon.
4. How quickly can I get my order finished?
The production lead time is dependent on the quantity. Typically, it takes 5 to 15 working days for us to complete mass production once you have placed the order.
5. What about your quality control?
By visual inspection, optical or pressure sensitive equipment and automated 3D image-inspection equipment, our production operators conduct self-inspections at every stage of the process. Additionally, we have spot inspections and final inspections carried out by our Quality Control (QC) team.
6. What's your largest advantage?
One of our core competencies is our excellent converting capabilities from yarn over weaving to converted items with professional technical team and quality guarantee and management for more than 30 years.
7. What kind of payment terms do you accept?
T/T and LC and more.